The bridge was opened for traffic on 5 October 2013 after four years of construction with a total cost of NT$700 million. The bridge was built to replace the original bridge named Wutai No. 1 Bridge which was destroyed by Typhoon Morakot in August 2009.
The bridge plays a significant role in the economic activity of Wutai Township which is located in an isolated mountain region in southern Taiwan. Tourists have been coming to the township through the bridge which led to the opening of several new hotels.